Charge Rate Structure |
EPCI Solutions provides competitive rates, structured to meet project budgets
We believe that the price of the service must be competitive to the value of the service. With that in mind, we should collectively explore the optimum pricing structure that provides good, timely performance; at reasonable margins.
We are able to offer fixed-fee pricing for deliverables where the input and scope can be well bound, or we are able to offer a manhour reimbursable fee for services over time. We also can develop fee structing based on hybrid approach.
Rates are based on Professional Grade and location, along the lines:
Grade
Location, (with typical weekly hours):
We are able to offer fixed-fee pricing for deliverables where the input and scope can be well bound, or we are able to offer a manhour reimbursable fee for services over time. We also can develop fee structing based on hybrid approach.
Rates are based on Professional Grade and location, along the lines:
Grade
- Grade 5 - Project Manager
- Grade 4 - Project Engineer, Technical Manager
- Grade 3 - Electrical/Instrument Engineer
- Grade 2 - Design Engineer / Factory Technician
- Grade 1 - Other
Location, (with typical weekly hours):
- Office (37 - 40)
- Factory (37 - 40)
- Site (Greenfield, Brownfield, Shipyard, Offshore) (40 - 50)